okay, been a hectic few weeks with some dental work which went south and caused all kinds of issues, problem with dust collector, took me a bit to find it, but seems when cleaning shop, i or someone else sucked up a small rag and of course, unc murphy was around to assist and one rather large pc of table saw rip managed to lodge it at the screen as it entered the turbine of dust collector, i'd noticed the ''suck'' wasn't what i expected when turning the rolling pins on lathe) so anyhowz, once i figured that out, needed to batten down tools as the ''suck'' was back. 

lesson learned also, my use of the soft caulk material may not be as great as i had hoped for, i've noticed it has dried some and shrank, allowing small dust to escape, so.hhh, maybe the real ''juice" caulking may be required, i don't really wanna tape it, just incase i wanna relocate which it seems i do every few months, i figure i'm about 60% on my final layout, as my projects change i see benefits of moving equipment that works even better doing multiple different type projects. 

and adding the now running cnc router, presently has a shop vac for dust control, but once i find a final position, (shoulda built shop a whole lot bigger, ugh), i think i want to  hook i up to the shop DC. see what happens, 

project after Christmas is build the cabts and counter for chop saw, and finish screen door, if i could just get one day, i'd have the scren done and ready for actual screen to be installed, but seems life is getting in the way of projects. 

happy saturday, off to add maybe more wood to the pile

rj in az

  • Like 3
  • 2 months later...
Posted

Great progess Rj. Nicely done for the blade storage. Gives me a couple needed ideas.

Posted

wished its been my idea but was perusing the interwebs and came across an old video, i like the idea of the drawer, eventually will cull out the older blades that once dull will go in the ''maybe make a knife stack'', while i sold all my grizzley knife making tools, i can still make due if  i set my mine to it. 

today gonna try and get other base unit done, and begin drawer fab, really need to get a gaggle done so i can get shop back in shape, have everything misplaced to do this, and with moving the cnc, to another wall, have to figure out the dust pick up, extend the main system or go with a vac, vacs are so loud, while i'm almost deaf, i kinda wanna keep some hearing ability. lol.

 

see whut happens today, with the call for rain, be a good day to hide out in shop, happy tuesday, 

rj in az

  • Like 2
Posted

Whew, busy day Rj. You need a project manager to keep track of all the different disciplines you've got going. Definitely not in a rut doing repetitive work. Looking forward to seeing the 3D covers in place.

  • Like 3
  • 4 weeks later...
Posted

boy howdy, i just knew when the ole gal convinced me to lop off 10 ft of length of the new shop, i'd regret it, but she shammed me into doing it, now i have a chance to buy almost 400 bf of awesome walnut, in 4/4 surfaced , and 8/4 rough, some book matched pieces, for half of what the local vendors are getting right at 7 bucks a bf, so. .not having a safe from the weather location to store, ugh, may have to pray to the wood storage fairies and figure out how to double stack, wave a wand oh my, hate passing on a deal. let me see, 

hate it when i find i made a mistake many moons ago. ugh

happy thursday

rj in az

Posted
4 hours ago, knockonit said:

may have to pray to the wood storage fairies and figure out how to double stack

Would short term storage in a storage unit be a feasible option? Any friends or family have unused storage or garage space available? Anyone in your area rent or lease 20' shipping/cargo containers?

  • Like 2
Posted

gonna try and bribe fella down street, he has an empty garage bay, and if the seller will hold a few days, i may be able to do some re organizing of a couple storage areas to make something work, see whut happens in next few days, 

thanks 

rj in az

  • Like 3
Posted
4 minutes ago, knockonit said:

gonna try and bribe fella down street, he has an empty garage bay, and if the seller will hold a few days, i may be able to do some re organizing of a couple storage areas to make something work, see whut happens in next few days, 

thanks 

rj in az

Best of fortune. Hope this all works out for ya' RJ. Would be a great score.

  • Like 2
Posted
14 hours ago, knockonit said:

but she shammed me into doing it

 

Don't be too hard on her RJ, from my experience, had the 10' been on already it would be full and you would still be 10' shy...:o

  • Like 1
  • Haha 2

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...