February 5, 20233 yr Author Popular Post comment_307973 The drywall guy showed today and finished up so now we can get this room done. Seems like it’s taking forever. I glued up the pieces for the countertop today. Tomorrow everything should be dry enough to paint. Paul Report
February 5, 20233 yr Author Popular Post comment_308033 I finished up the countertop blank. I will put a mahogany edge band on it then it’s ready for install. Paul Report
March 3, 20233 yr Author Popular Post comment_309818 Things are now moving along. We got the upper cabinets installed. Next the lower cabinet and a little tile work. Paul Report
March 4, 20233 yr Author comment_309864 Oops. Apparently I put a dent in the top of the Washer. Boss is not happy. ☹️ Report
March 8, 20233 yr Author Popular Post comment_310188 Making progress. Completed the hanger rack and got all the drawer slides installed. One drawer installed. Tomorrow is another day 🥺 Paul Report
March 8, 20233 yr comment_310196 It is looking nice, Paul. What is the plan for the wiring you have in one of the upper cabinets? Danl Report
March 8, 20233 yr Author Popular Post comment_310197 That’s all the speaker wire and LED wiring for the family room. Paul Report
April 3, 20233 yr Author Popular Post comment_311869 Well the out of town guests are gone so all my excuses for not getting back to work just evaporated. I got all the drawers installed in the lower, shelving in the other upper and the drawer fronts made and first coat of finish on. Onward and upward. Paul Report
April 4, 20233 yr Author comment_311921 It’s a three car garage. There are two sets of doors. There are standard roll up doors on the two car and one car side on the inside. On the outside I built and installed outer doors on both sides to act as heat shields and according to the boss they look better. On the two car side there are four doors. Each set of two are hinged at the jam side and also in the middle. It allows me two open up one, two, three or all four doors depending on the temperature outside. I had to resort to this because that side of the house gets intense heat in the summer and when the sun hit those aluminum roll up doors the AC could not keep up and it turned into an oven. With the outer doors installed I can keep it at a comfortable 70-75 degrees all day. Paul Report
April 14, 20233 yr Author Popular Post comment_312394 Making progress. All the drawer fronts are on. Paul Report
April 14, 20233 yr Author comment_312399 Thanks Lew. The wife called for flush wooden handles and that’s what we came up with. It’s a three step router design that was quick and simple to do. I used the Shaper Origin to cut the blank oval opening but could have just as easily used a template and collet, then a 1/8” radius round over for the face and the bottom is a cove bit to cut out the recess. Paul Report