Skip to content
View in the app

A better way to browse. Learn more.

The Patriot Woodworker

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

A New Shop?

Featured Replies

  • Popular Post
5 hours ago, BB1 said:

Tough doing that alone. I have used a 2x4 or other scrap screwed in as a temporary support ledge - really works as an extra hand to set the item on when having to attach something unwieldy. Also having all the screws started is helpful for me as I seem to drop the screw or miss the mark otherwise (especially when trying to rush when dealing with holding up something heavy).

X2. I have always used a ledger strip when installing wall cabinets. Tough finding a straight 2x4 though.

An alternative is a french cleat.

Seeing all your braces reminds me of a friend who worked in a hospital shop. He said they didn't change the router bit, they just changed the routers.

  • Replies 51
  • Views 1.8k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • steven newman
    steven newman

    Key to the "old House" was turned in at 1700 hrs, today...Will need most of August to get everything sorted out and put away....once we figure out which box had which items in it... Right now, comput

  • steven newman
    steven newman

    Next Wednesday...we close on the place.. Since this will no longer be a "Dungeon Wood Shop"......may have to start looking at a new name for it... and.. Stay tuned..

  • Fred W. Hargis Jr
    Fred W. Hargis Jr

    Congratulations, Steven. Should work out nicely, just think: no more trying to move that stuff you make up steps. Have you lined up help for the move? Moving at our age, (well ,maybe my age) is not a

Posted Images

  • Author

Sometimes, I simply cheat...

New Woodshop, day 2, 2nd hour's work  .jpg

Set 2 planks underneath...screws at the top of the case..sawhorse was simply sitting there, in the way, of course. Waiting on proper screws for the Piano hinges on the doors.

Meanwhile...something is missing...?

New Woodshop, day 2, something missing  .jpg

Follow the drag marks in the gravel...

New Woodshop, day 2, 1st hour's work  .jpg

Ah, there it is...Along with a few other things..

New Woodshop, day 2, small clamp stored  .jpg

Stanley No. 7c was used to plane 2 drawers for a better fit. 1st shavings in the New Woodshop, are sitting down on the "floor". Hung up some small c clamps....and 2 hacksaws.

New Woodshop, day 2, hanging around  .jpg

Hung up the Mortise Chisel case, and 2 HUGE drills.

Which means this tub is now emptied out. Miter Trimmer is sitting on the sideboard, for now..

New Woodshop, day 2, 1 emptied out  .jpg

Also, found these 2..

New Woodshop, day 2, needs a charger  .jpg

But, I lost their charger long ago. Keyed and keyless chucks....

Stay tuned..

  • Author
  • Popular Post

10 Aug update:

10 AUG,  doors are done  .jpg

Doors installed..

10 AUG, hanging some doors  .jpg

Bottom step is done did..

10 AUG, 4th step done  .jpg

11 AUG Update:

11 AUG, unpacking, more layers  .jpg

Yet another shipping tub was opened..to 4 layers of tools...meant I had a few to put away..

11 AUG, unpacking, putting away  .jpg

Block planes and jacks...along with a Stanley No. 7c and an 8c....

Close these doors, for now...

11 AUG, unpacking, close the doors  .jpg

Need a place to stash the rest..be it marking gauges..

11 AUG, unpacking, left side .jpg

Or, eggbeater drills...

11 AUG, unpacking, right side   .jpg

And maybe a few squares? About that overloaded bottom shelf?

11 AUG, unpacking, small planes   .jpg

Just a few Smoothers, A Stanley No. 4-1/2c, Type 11, and a type Millers Falls No.11, junior jack.. rest are all just #3 and #4 sized planes..

12 AUG Update: LIGHTS!

12 AUG, New Lights, 2 out of 4  .jpg

2 Lights, 4' Single bulb LED Shop lights are now over the shop area...

12 AUG, New Lights, Filling up  .jpg

Old Computer Desk Hutch now has a better job to do....as the top of Tub #3..

12 AUG, New Lights, tub#3 opened up  .jpg

Looked like this....so...

12 AUG, New Lights, install window shelf  .jpg

Hung a Window Shelf. Between this and the saw til...

12 AUG, New Lights, Hacksaw til   .jpg

A place to hang a few hacksaws...

Need to empty out the rest of the tub...and maybe think about a Stand for this..

12 AUG, New Lights, needs a stand built  .jpg

Or, simply adapt it to fit in the end vise like the other grinder...?

Stay tuned..

  • Popular Post

almost as organized as my shop is all the time ROFL , keep on you'll get there eventually.

Looks good Bandit, you'll be up and running in no time.

  • Author
  • Popular Post

Looking to add this thing to the new shop..

13 Aug, trip home, $50 saw  .jpg

Pay Day is next Wednesday...we'll see...

13 AUG, trip home, long fence  .jpg

Thinking it MIGHT just be an "Upgrade"?

  • Author
  • Popular Post

Details?

13 AUG Tablesaw, Details,  cord  .jpg

110vac cord...

13 AUG Tablesaw, Details, size  .jpg

upgrading from an 8" saw to a 10" saw....complete with the elevation wheel

13 AUG Tablesaw, Details, Shop Fox fence  .jpg

Shop Fox Fence, with this much room..

13 AUG Tablesaw, Details, limit  .jpg

53"...might come in handy..

13 AUG Tablesaw, Details, adjustable legs  .jpg

Legs have levelers with pads...

Motor?

13 AUG Tablesaw, Details, motor details  .jpg

Says it is a 2hp?

13 AUG Tablesaw, Details,  thermal breaker  .jpg

Has a Thermal Breaker....

13 AUG Tablesaw, Details, needs a cleaning  .jpg

MIGHT need a bit of cleaning up.

Picking this up next Wednesday...Price? $40 Cash...

13 AUG Tablesaw, Details, levelers  .jpg

This even has leveler bolts...Blade does look too hateful...green stuff? That is the wet grass sitting under the saw...

Stay tuned..

53 minutes ago, steven newman said:

Picking this up next Wednesday.

Wish I had room for those extra extensions!

A can of PB Blaster & some green scrubbing pads will take care of the rust and some 600 sandpaper to a final polish.

  • Author
  • Popular Post

Need to both put more tools away, and clear out a space for the new saw...so

15 Aug, new shop, french drain opened up  .jpg

First, make sure the drain is free of any clogs...

Still working through that last tub...

15 AUG, new shop, a better place  .jpg

More on that old chest in a bit...

15 AUG, new shop, loaded up  .jpg

Right door got even more drills, and a small level...and most of the Bevel Squares, 2 spokeshaves, and 2 No. 80 scrapers...

15 AUG, new shop, hammerski  .jpg

A place to hang a few hammers...and..

15 AUG, new shop, braced up  .jpg

Every sized Brace Drill from 6" to 14" sweep....Still finding Screwdrivers..

15 AUG, new shop, coping saw  .jpg

And about half of my Coping saws...and one Dovetail saw, so far...even most of the "old style" Turnscrews...

A ladder is going to have to be moved, before Wednesday...

15 AUG, new shop, needs to leave  .jpg

Going to be in the way, otherwise, same with this pile...

15 AUG, new shop, needs to get moved  .jpg

There is that old chest, again...the rest got put away, for now....as this area will be needed for the tablesaw..

15 AUG, new shop, take out the trash  .jpg

Drag the scrap cardboard out, recycle center is about a 1/4 mile east of here...can almost just walk over there...

Need to get these tubs either emptied out, or stash away...

15 AUG, new shop, future site of workbench  .jpg

As this will be the site of the workbench...

Tornado warnings around here this evening....all we got was a short Frog-Drowner....no wind, no noise, no Light Show...other than the Sirens going off every 10 minutes...LOUDLY.

Have to wait and see what I can get done, Sunday..

Wondering IF I can set the saw up on the back patio...dis-assemble it as I clean it up...and then move it into place piece by cleaned piece?

Stay tuned...

On 7/20/2026 at 11:08 AM, John Morris said:

So did we Steven, for our move. Can't beat the price, at least in my neck of the woods Home Depot puts them on sale for about 10 bucks each for the large ones, and I've been filling them up step by step with my shop stuff and heavy items from the garage. They are pretty nice, and stackable!

Hey we get them for under 8 regularly.

@steven newman looking good. Don't know how I missed this. And now no laundry in shop, NO river in shop, AND no stairs to haul everything up. You gonna really love all that.

On 8/7/2026 at 3:09 AM, JimM said:

Seeing all your braces reminds me of a friend who worked in a hospital shop. He said they didn't change the router bit, they just changed the routers.

Yup. I've worked for shops like that. Usually it was those wonderful old PC laminate trimmers - one for each size roundover bit the shop used, another for the hinge mortising bit, etc. If the shop did a lot of table edge profiles it would be bigger routers with the 3-4 most commonly used profile bits.

  • Author

This arrived about Noon yesterday..

19 AUG, Tablesaw delivery, bent another  .jpg

Paid the fellow $40.00

19 AUG, Tablesaw delivery  bent a leg.jpg

Bent one leg during the load/unload cycle....block was to keep from bending any more..

Fence did lock down nicely..

19 AUG, Tablesaw delivery, it even locks down  .jpg

Then..a few hours later, we went from partly cloudy skies to....( hide yer eyes, Mabel!)

19 Aug. Flood, View from the ramp  .jpg

about 3 hours of steady, HEAVY rain....5-6" of it....with about 4" winding up inside the garage.....

19 Aug. Flood, Looking northwest  .jpg

The Dungeon Creek had moved outdoors....thanks to a neighbor's blocked driveway culvert....diverting runoff away from the ditch, and down through our front lawn...this patio/porch is about 24" higher than the yard....wet because of the wind blowing in from the west..

Waiting on things to dry out the next few days...stay tuned

  • Author
  • Popular Post

Cleaned up the saw..

20 Aug, tablesaw rehab, cleaned and ready   .jpg

Figured out it would be a lot easier ( and lighter) to remove the rails, THEN move the saw into it's place in the shop..so..

21 Aug, Tablesaw work, front rail removed  .jpg

Front rail....weighs about half of the tablesaw..."H.B."

Rear rail?

21 Aug, Tablesaw work, back rail removed  .jpg

Weigh about a third of the front rail...

Saw itself? Stand up on one end, onto a 2 wheeler cart, rope it in place, and roll it into the shop..

21 Aug, Tablesaw work, waiting on new bolts  .jpg

Tools needed?

21 Aug, Tablesaw work, full tool kit  .jpg

Why so many.....seems that half of the bolts , or bolt holes were stripped....half of the bolts did not match the other half..

21 Aug, Tablesaw work, BAD Bolts.jpg

And were a collection of MOPAR made bolts.....always way too long.

Shopping trip for a load of 2x lumber to build a power tool bench and replacement hardware to replace all these bolts, nuts, and washers...and a bottle of 3in1 Oil to rub the top of the saw down.

21 Aug, Tablesaw work, new finish blade  .jpg

Tablesaw came with an 80 toothed Carbide blade....figured I can have a "Back-up plan" plus, I needed a decent rip blade..

21 Aug, Tablesaw work, New Rip blade  .jpg

Need to go back out to the shop, and take a couple photos....re-installing them rails, BY MYSELF....involved about an hours work....and a lot of cussing, digging out gravel to help level things...

Stay tuned...

Have to also cut and fit these..

21 Aug, Tablesaw work, tool stand to be made  .jpg

Into a bench to set the Drill Press and other powered tools on...

Nut to remove to change the saw blades.....needs a wrench...size? 1-5/8".....so

21 Aug, Tablesaw work, buy 6 to get 1   .jpg

Harbor Freight does NOT sell "Singles" they sell "Sets"....Counting the bottle of 3in1 oil...$70 and change

21 Aug, Tablesaw work, THAT one  .jpg

Hmm, the others might be handy to have around...( Menard's does sell "Singles" @ $29.95 + tax.......)

So..plan today? Open the doors to the Garage, air it out some more...maybe take a few photos, and plan how the bench will look when done ( Hint: that 2x 12 x 6' will be the "TOP")

Stay tuned..

  • Popular Post
2 hours ago, steven newman said:

And were a collection of MOPAR made bolts.....always way too long.

"That bolt is longer than a Monday"

Heard while a guy worked on a car.

@steven newman I have some bolts from the original fence on my old Craftsman if you want them can sent to you.

  • Author
  • Popular Post

Went to Menard's...bought new bolts, nuts and washers...and

21 Aug, Tablesaw work, tool stand to be made  .jpg

Enough to build a bench for the benchtop power tools to sit on...

Got the tablesaw moved into the shop..

21 Aug,  waiting on new bolts  .jpg

Then the fun of re-installing the rails, single-handed...

22 Aug, tablesaw, rails installed  .jpg

Dig down a bit helped out, and there was still a look of cussing going on,

22 Aug, tablesaw, sitting level  .jpg

And finally got the entire mess to sit fairly close to level, and not wiggle around..

Next item....that set of wrenches?

All were way too BIG, dug around in my old roll-around...

22 Aug, tablesaw, type of blade  .jpg

Lookee what I found. put things back together...try the nickel test, passed....tried the saw one more time....Ooops...

22 Aug, tablesaw, the Magic Smoke   .jpg

Where there is Magic Smoke, sometimes there is fire....so..

23 Aug, Motor troubles, too many tools  .jpg

Grab out the tools...big file and hammer to remove the pulley..

23 Aug, Motor troubles, stripped down  .jpg

Then the frame and the cord..

23 Aug, Motor Troubles, saveables, for the new motor.jpg

1 bolt was an extra one, because 1 of the 4 frame bolts was MIA...

Spent the rest of the day, in search of a new motor....wound up down in Piqua, OH Home Depot...where they ordered one on-line ( be here this coming Wednesday)

22 Aug, tablesaw, bought a new motor  .jpg

VEVOR 1hp....

So, to kill a wee bit of time, decided to make a bit of sawdust...

23 Aug, Bench Builder, making saw dust  .jpg

Needed to build a box from a pair of 2 x 6 x 6 planks, add some 1 x 4 pieces..

23 Aug, Bench Builder, next up  .jpg

Cross cut a 2 x 8 x 6' at 36" and rip for leg blanks..

23 Aug, Bench Builder, ripping legs  .jpg

This way, because neither tablesaw is up and running..

Then install 4 legs...

23 Aug, Bench Builder, install 4 legs  .jpg

Cross cut 2 pieces of 2 x 6 and add them near the bottom of the legs...

23 Aug, Bench Builder, Wide enough, maybe  .jpg

A "Top" made of a 2 x 12 x 6' and a pair of 2 x 8 x 6' was screwed down ...second 2 x 8 was ripped for final width..and places were cleaned up...

23 Aug, Bench Builder, hand tool in use  .jpg

where the 6-1/2" saw blade couldn't quite reach...along with a few high spots...

23 Aug, Bench Builder, plane work  .jpg

Top is at 38" above the floor. Bench is a little tippy, will cut the last 2 x 6 in half, and make feet out of them....

Not too hateful, for just over an hour of sawdust making.....then an Ice COLD Tonic & Gin....

21 JUN, Father's Day, Gin for Tonic  .jpg

careful..this stuff packs quite a "kick"...Bug_Eye_Smiley.thumb

Hauling the old motor to the scrappers, today....Boss has errands up that way...come back home and build some feet for the Bench....

Stay tuned

35 minutes ago, steven newman said:

Where there is Magic Smoke, sometimes there is fire....so..

Well that's not good!

I hate it when that happens, really drives the cost of a bargain up.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.