April 15, 20233 yr Popular Post comment_312440 Finally moving into a new shop. I am moving out of the small blue building into the large building with the red roof. It is going to be a long process but well worth it. Report
April 15, 20233 yr Popular Post comment_312442 Spreading your wings are ya? Lots of new space to enjoy. Congrats. Report
April 15, 20233 yr Popular Post comment_312443 That's awesome Rusty. Green like your grass with envy. Looks like maybe 24'x36'? Concrete floor? Of course we'll need move update progress pictures. Report
April 15, 20233 yr Popular Post comment_312446 A big congrats, and you're right....it will be a log process but well worth it. Enjoy! Report
April 16, 20233 yr Popular Post comment_312488 Color me green with envy, and red for happiness for you. Report
April 16, 20233 yr Author Popular Post comment_312489 The wife and I went through the storage shelves today and got rid of a lot. I am going to build a room inside at the back that will be 24 feet wide and 6 feet deep. That will allow us to keep ten storage shelves and a cloths rack for her seasonal clothes. Then I will build a small room for my air compressor and dust collector. That will still give me twice as much as I have now. Report
April 16, 20233 yr comment_312499 Looks nearly full already Rusty, shuda built it bigger! 9 hours ago, RustyFN said: Then I will build a small room for my air compressor and dust collector. I did this same thing and wish I hadn't. When the a/c is working a lot it will heat up the room (5x10 or 6x10) even with the door open. When the room heats up it starts pumping a lot of water. This isn't so much a problem while woodworking, but when I was doing auto body and today if I have a bunch of sand blasting to do it is. I deal with it by having installed a fan in the ceiling to bring in fresh air into the compressor room, installed a water trap and Motor toilet paper filter at the end of the line and even used disposable filters at the paint gun. I've made do, but wished I had just poured a slab on the side of the garage and extended the roof. YMMV Report
April 16, 20233 yr Author comment_312502 46 minutes ago, Cal said: Looks nearly full already Rusty, shuda built it bigger! I did this same thing and wish I hadn't. When the a/c is working a lot it will heat up the room (5x10 or 6x10) even with the door open. When the room heats up it starts pumping a lot of water. This isn't so much a problem while woodworking, but when I was doing auto body and today if I have a bunch of sand blasting to do it is. I deal with it by having installed a fan in the ceiling to bring in fresh air into the compressor room, installed a water trap and Motor toilet paper filter at the end of the line and even used disposable filters at the paint gun. I've made do, but wished I had just poured a slab on the side of the garage and extended the roof. YMMV Good to know. I might leave the air compressor out then. It is a quiet one so it doesn’t really bother me now only being five feet from my lathe. The dust collection will definitely have its own room. Report
April 21, 20233 yr Author comment_312822 I installed enough insulation and plastic for vapor barrier to be able to put up enough OSB to build the storage room. Report
April 24, 20233 yr Author Popular Post comment_313034 My buddy came over today. We got the first 8 feet of ceiling up and the storage room wall built. Report
April 25, 20233 yr comment_313044 Great progress Rusty. You've probably already planned for it, but I'd make sure the door to the storage rooms swings out into the larger space. Report
April 25, 20233 yr Popular Post comment_313047 Running out of room already. Maybe the bicycles and kyacks could go back to the old shop Report
April 25, 20233 yr Author Popular Post comment_313073 19 hours ago, Grandpadave52 said: Great progress Rusty. You've probably already planned for it, but I'd make sure the door to the storage rooms swings out into the larger space. That was the plan. Report
April 25, 20233 yr Author Popular Post comment_313074 17 hours ago, Al B said: Running out of room already. Maybe the bicycles and kyacks could go back to the old shop Everything that is not a woodworking tool will end up there. Report
April 25, 20233 yr Popular Post comment_313075 22 hours ago, RustyFN said: My buddy came over today. We got the first 8 feet of ceiling up and the storage room wall built. Looking great! Are there outlets along the walls? I'm not seeing them from here. Maybe we need an emoji for envy. Edited April 25, 20233 yr by JimM Report
April 25, 20233 yr Author Popular Post comment_313076 1 hour ago, JimM said: Looking great! Are there outlets along the walls? I'm not seeing them from here. Maybe we need an emoji for envy. Thanks. No outlets yet. I want to get the ceiling done and paint the walls and ceiling white. Then I will start the electrical. It will all be done on the surface with EMT and cast boxes. Report
April 26, 20233 yr Popular Post comment_313121 On 4/25/2023 at 5:59 PM, RustyFN said: Thanks. No outlets yet. I want to get the ceiling done and paint the walls and ceiling white. Then I will start the electrical. It will all be done on the surface with EMT and cast boxes. The beauty of surface electrical, is how easy it is to make changes in the future! Report