Skip to content
View in the app

A better way to browse. Learn more.

The Patriot Woodworker

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Featured Replies

52 minutes ago, Grandpadave52 said:

or will you need more time to string banners, balloons and crepe paper?

 

and get a larger collection of tools as door prizes...

  • Replies 97
  • Views 9.7k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Fred W. Hargis Jr
    Fred W. Hargis Jr

    Well since you asked, they got the rest of the rock up today. The company owner was out late last night to pick up the scraps and debris and told me the finishers would be here early this morning to g

  • Fred W. Hargis Jr
    Fred W. Hargis Jr

    The sheet rock was just delivered...so at this point the contractor has some skin in the game. I'm really feeling giddy about this, kind of immature I guess. Oh well, I'm old...I get to feel anyway I

  • Fred W. Hargis Jr
    Fred W. Hargis Jr

    Reminds me of when the framing crew was here doing the building. It was an Amish crew and they had not thought ahead to the framing of the porch. The boss said he had to think it through, he would do

Posted Images

  • Author

Probably all the above. Yesterday one of the guys had to leave early for a doctor appointment, the second guy (very young fellow) stayed and worked until about 6:00. I went out to look at what they had done, these guys are awesome. Really nice job on the taping. Just looking at how they did it, I can see many of the things I always did wrong when I did my own drywall. For the record, I always impressed myself with just how really (really) bad I am at doing drywall work...besides it not being much fun.

Well, is it ready for primer yet?:P

Wow ! I'm green with envy ! Looks like everything is finally coming together.

13 hours ago, Fred W. Hargis Jr said:

Probably all the above. Yesterday one of the guys had to leave early for a doctor appointment, the second guy (very young fellow) stayed and worked until about 6:00. I went out to look at what they had done, these guys are awesome. Really nice job on the taping. Just looking at how they did it, I can see many of the things I always did wrong when I did my own drywall. For the record, I always impressed myself with just how really (really) bad I am at doing drywall work...besides it not being much fun.

They did a good job hanging ,Fred, glad you waited for this crew to show. If they do as good taping and mudding,you will be able the make it into a banquet room. You did like I did on the outlets,a 4X4 every 6" , every other one a 2X4 220v. Outlets in the ceiling for machine drops and lights.I split the circuits each wall a separate circuit and the ceiling too. Never can have too many outlets.

Herb

 

Edited by Dadio

10 minutes ago, Dadio said:

Never can have too many outlets.

Ain't that the truth?  I thought I had plenty. I don't. 

Fred I have 35 2-tube 4" long t-12 fixtures in my shop roughly the size of yours. There are not shadows in any direction. I have replaced the bulbs in 4 fixtures with LE as the ballasts/bulbs go out.

I had a lighting engineer calculae what I should in stall.

here is a discussion on the topic for your infomation.

 

http://www.vansairforce.com/community/showthread.php?t=106947

 

Herb

10 minutes ago, Gene Howe said:

Ain't that the truth?  I thought I had plenty. I don't. 

 

and how many are in the wrong place...

12 minutes ago, Gene Howe said:

Ain't that the truth?  I thought I had plenty. I don't. 

Don't like tripping over cords on the floor either.

just saying,

Herb

Edited by Dadio

1 minute ago, Dadio said:

Don't like tripping over cords on the floor either.

just saying,

Herb

 

I'm a big fan of surface mounting the outlets...

Just now, Stick486 said:

 

I'm a big fan of surface mounting the outlets...

 

All my electrical is surface mounted.

Herb

  • Author
  • Popular Post

Here we go, after they finished Thursday they didn't return Friday...just as well, I noticed the mud wasn't completely dry; cooler temps have slowed things down. I have really learned a lot just looking at how they did the first coat. Not that it matters, I don't intend to do much of this anymore. I was really impressed with how wide they went at the butt (end to end) joints. They did leave their stilts behind, if I was a younger, more foolish person I might try them out this weekend.

 

1stctshopsm.JPG

1stctstorsm.JPG

Impressive job. Neat and professional.

Well done Fred and hopefully worth the wait.  As for the stilts, go for it.  What do you have to lose?  Well, on second thought.

That looks like a top rate job. Hopefully well worth the wait for you

Spectacular job Fred. The fact they took the time to cover a concrete shop floor with rosin paper says you are getting a top-notch professional job.

 

It's going to be tough to put holes in that to hang things up.:P

Here is a thought @Fred W. Hargis Jr, if you haven't already done so, but mark on the floors where the studs are. That would help later when you go to hang something and you want to use a stud. Also, maybe take some detailed pictures with a tape measure showing stud locations. It is just a thought to help with the later stages.

Looks good, Fred. Just goes to show you....... All things come to him who waits. And waits. And waits..........

John

  • Author
  • Popular Post
2 hours ago, Chips N Dust said:

Here is a thought @Fred W. Hargis Jr, if you haven't already done so, but mark on the floors where the studs are. That would help later when you go to hang something and you want to use a stud. Also, maybe take some detailed pictures with a tape measure showing stud locations. It is just a thought to help with the later stages.

I intend to do just that, I'll put paint dots under each one on the concrete curb.

  • Author

So as of yesterday, they have the 3 coats of mud completed. Monday morning they were here (2 folks) and did the second coat, took them all of 3 hours and they went to the next job to let it dry. Yesterday one guy came back (2nd fellow was ill) and he did the 3rd coat, taking probably about 7+ hours. He must have done some of that magic trick with a sponge drywallers can do...wish I had seen that in practice. Anyway, the job is incredible...I doubt it will take them more than a couple of hours to sand it out and be done. This was the first tiome I had seen drywall done professionally so maybe I'm over impressed. But I know if I had done it, I would have used 4 times the mud, and it would take until Christmas to sand it out. So as painful as the wait was, it was worth it to me. Still wish I had seen that sponge used though, I've heard if you sponge it with the right touch when the mud is wet, it may not even need sanding...could be useful to know for patch work jobs.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.