Skip to content
View in the app

A better way to browse. Learn more.

The Patriot Woodworker

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Something for August?

Featured Replies

  • Popular Post

This thing hanging on the Bathroom wall..:ArguingSmileys:

BathroomCabinetswecandobetter.jpg.999981e9df86bcabc09a5d6bb1a50140.jpg

Wall E World's finest....someone used a cove bit and made fake raised panels...because on the inside..:BugEyeSmiley:

BathroomCabinetsmayberecyclehardware.jpg.d76b569f332e205646e7dc8d9d9fa424.jpg

Just plain white "board"...I might recycle the hardware,,,the rest will just have to go to the Fire Pit...bacause ( besides being very UGLY:rolleyes:) ....

BathroomCabinetsdoesnotfitin.jpg.a0adffad76e7551cd02efb055e003781.jpg

Does NOT match up with this cabinet over the sink...nor...:JawDrop:

BathroomCabinetsnotamatch.jpg.7e79693632995ac7d311ec36edd90565.jpg

The one over the Throne...so...:ChinScratch:

The Plan...is to cut a few sticks of Ash up and build a "copy" in Ash...with real raised panel doors...to match ..:Cheer:

BathroomCabinetProjectPostdoorsclosed.JPG.715f58a69ef28ce139bbb0bbdd24b666.JPG

These 2 doors...right down to the bead details..:OldManSmiley:

BathroomCabinettestfitcorner.JPG.b9854d0c23046ea6febb31b683126652.JPG

And the joinery..:ChinScratch:

BathroomCabinetframepartsdone.JPG.8908b311e3153127529221a622147a0b.JPG

Moose & Squirrel Express has dropped off a "Plan":TwoThumbsUp:

BathroomProjectThePlan.jpg.3f4b78771f47bcfbd6103706d1abba1f.jpg

With a bit of a cut list...:WonderScratch:

BathroomProjectcutlist.jpg.2a6c181ab99fccdf748bee94f3018315.jpg

 

Will be dragging this tool out..:JawDrop:

BathroomProjectneedthislater.jpg.b75068ba124d372dfe04a485227c4a7e.jpg

And try to get 2 panels ready for a glue up...to make the Raised panels  for the doors..:Cheer:

 

Hopefully get this done and on the wall by Labor Day Weekend..I hope...:rolleyes:

Stay tuned..:cowboy:

  • Popular Post

Following along. Do your best to get it done by Labor Day weekend please. I plan to take that weekend off.:rolleyes:

  • Popular Post

Looks like we are off to the races :lol:

  • Author
  • Popular Post

Day #1...

Cross cut about 2 planks..needed 6 blanks to build two raised panels..

BathroomProjectday1Cardioanyone.jpg.f9f2ab3faef9dc9bb1d6f20157f74cfc.jpg

One plank was a bit thicker than the over...so...then..

BathroomProjectday1levelingup.jpg.a9b93d6d0d5f105f7415a8f44f4d64bd.jpg

Level up after the saws..the rip saw "popped" off a piece..

BathroomProjectday1busyday.jpg.607f7db05731ca26ecb3f266593ed4bd.jpg

Laying there in the shavings...so..the matching piece was simply run through the bandsaw, instead..

BathroomProjectday1StanleyNo_6c.jpg.6803173ae30826d925cd501d70008f5c.jpg

Somehow, they both wound up thinner than the center blank...but, since it was also still rough sawn..

BathroomProjectday1thinningdown.jpg.5ad8fa1b689c8c5fd9a48085fd3d9543.jpg

I smoothed both faces down, and got as close to the other 2 as I could...enough that..

BathroomProjectday1clamps.jpg.fb9b5e887fc6debbb632e60bdb8ec28d.jpg

I needed one smooth face, which is why the single cauls...A friend of mine has a 12" Lunch Box Planer...so once BOTH panels are out of the clamps, I might haul them over and run them through...any snipe will be taken out when I raised the panels....panels are 13" x 13"....I need 11" x 11" raised Panels...

 

2nd panel?

BathroomProjectday2needsjointed.jpg.9f921d117d3f5ea4af0fcff3d29e3de0.jpg

Arranged for best grain match..seems it will need a jointer?

We have ways..

Bathroomprojectday2smalljointer.jpg.8a7381ede48871a56a9b5585eedbb8e7.jpg

Stanley called the No. 6 a Small Jointer...took a while until..

BathroomProjectday22ndgluedup.jpg.465cdd4b0c3f6211e1d51a1ff664e00b.jpg

Spread some glue. vise is both a 3rd hand and a caul...letting this sit a day or 2..

 

Meanwhile, I need to start milling up 2 frames to house these panels..and then see about building a box to hang the doors onto...

Stay tuned....

  • Author
  • Popular Post

Both panels are out of the clamps, and trimmed down to 11-1/4" width...:TwoThumbsUp:

 

problem I am having with the stock..:ArguingSmileys:

BathroomProjectday2thatthick.jpg.32ce8e767e97a14e1f7e0a525324fd77.jpg

All rough sawn, and @ 15/16" thick..and some even thicker!  need to get them all down the about 3/4" thick, maybe a shade under...:OldManSmiley:

 

8 Blanks for the frames were milled up.:Cheer:

BathroomProjectday2endgrain.jpg.a167fb54f777d793b1e709dd90995eb0.jpg

Cut to just over 14" in length, some a bit longer...width is 2"....Thickness was buzzed down to ~3/4" thick..clamped together to get them all used to their new size.:TwoThumbsUp:

 

Road Trip Today:   Boss has her errands, and while she is doing that, I drive over to my friend's barn...as he still has not only my old Lunch Box planer, but his copy of it...intend to run the parts through a few times...much easier to work with parts that are a consistent thickness...may even buy a couple new planks, while I am there...and run them through as well...we'll see...:ChinScratch:

 

Need to set up some things...:SaluteandRun:

BathroomCabinet2beadsdone.JPG.3e677b922901d518c2b90b460c08042f.JPG

As I need to mill 16 beads...with the Stanley #45...then..work on the joinery stuff..

BathroomCabinetframepartsdone.JPG.d90869cf320796c6005a0b07a8ab561c.JPG

To include the grooves to house the Raised panels in.

 

Stay tuned  :cowboy:

  • Popular Post

And all on one day. :oMakes me feel glad I am not starting a project for cabinets.

  • Author
  • Popular Post

Road Trip, today...Friend that I buy lumber from...also has a Lunch Box Planer...thought I'd take the panels and the rest to his barn..run them through a few times.....

Hmmmm....

 

Panels wound up badly sniped...but in the areas that did not matter...

BathroomProjectday2endgrain.jpg.7b53ca059a17f31cdc28563a6c8827df.jpg

Will replace about half of them..as the do not match the others..so..

BathroomProjectday3lumberrun.jpg.aa34e14fca7631a4d6c898e2a2a27d0e.jpg

For $10, and the use of his Mitersaw...the one with the "X" is still a tad too thick...and is NOT Ash...save it for the next Project..the 2 wider planks USED to be one plank, that we had to cut in half..at 5' per....and a re 3/4" x 10s....the others were cut down from 2 planks...a 10'er and an 8'er...

 

Between getting chased down a city street by TWO EMS Squads...almost getting hit by 4 other Darwin Award Winners...yep..one of THEM days....right foot was getting tired of the gas pedal, and decided to cramp up.   89 bright & sunny degrees outside...

 

Stay tuned...

  • Author
  • Popular Post

Decided to just make new frame parts...hauled the 2 pieces that USED to be 8' long to the shop...cut 4 blanks at 15" long.....then ripped those down to 2" widths, to get the 8 blanks I needed....:TwoThumbsUp:

 

Next. set up to mill a groove on...:SaluteandRun:

BathroomProjectday3groovy.jpg.80ffa0c61738cc0c4f0f01727194d34b.jpg

one edge..4 passes on the tablesaw.  Made a mess, too..( not the first of the day, either.:rolleyes:.)

BathroomProjectday3beenabitbusy.jpg.c8d8897aac3ea037242965e9e278b351.jpg

 

Wait a minute, I said 8 parts, right?  So where is #8 at?:WonderScratch:

BathroomProjectday3notmuchroom.jpg.b5c456b2acb159d1d90bb7d8aeb37528.jpg

Sitting over on the bench...in a simple jig..and getting a couple beads done..:Cheer:

BathroomProjectday3simplejig.jpg.fa94128e4f4780ff1718a751a46405fe.jpg

One on each edge......Stanley #45 with a ..

BathroomProjectday3No.23cutter.jpg.1711d32fa7d7b6f64b0ecbbd741527ec.jpg

No. 23 cutter...makes a nice mess on the floor, too...:ChinScratch:

BathroomProjectday3makingamess.jpg.9911b22623b61e629ea25fa641b26c67.jpg

Kind of stringy, too..one or two passes, stop, pull the strings out, and back to work...more than 3..it jambs up..:PullingHair:

BathroomProjectday32done.jpg.ee8c1a1ab100d4679133285b8f2bcbe3.jpg

Managed to get 2 done, before the cramps started up..even with the Fan set on HIGH...:DevilLaughing:

BathroomProjectday32done6togo.jpg.8f7a7da677a3045c882b7e33a1ca135f.jpg

2 done, only 6 more to do...pencil marks?  were to help layout the fence for the grooves..:OldManSmiley:

I did set up #3 in the jig...both..stopped there, for today..:GoodNight:

Stay tuned  :cowboy:

 

  • Author
  • Popular Post

16 beads are now done did...:SaluteandRun:

BathroomProjectday4beadsaredone.jpg.35e7a8348213d5f552a938009366018d.jpg

Put the jig away..need to figure out how to connect these in to frames for 2 doors...to where the outside looks like a Miter Joint..:ChinScratch:

BathroomProjecttestrunoutsideview.jpg.e014176b535b5eb66ca969c1f8c9ff6b.jpg

But..when you look at the inside of the frame's corner....:JawDrop:

BathroomProjecttestruninsideview.jpg.5fa6ac3ebbb06dd9f248eb5b2b253de3.jpg

They will look like this...have a couple things to correct...and still have 7 more corners to make...:Cheer:

Stay tuned..:cowboy:

  • Popular Post

That is coming along real nice Steve.:TwoThumbsUp:

  • Author
  • Popular Post

About an hour in the shop, today...one frame dry fitted...:ChinScratch:

BathroomProjectday5firstframedone.jpg.500cc5f60a33248acf347a6966eacba6.jpg

 

Working on frame #2..:Cheer:

BathroomProjectday5workingonit.jpg.21b829d64dca853c40f77275952b9237.jpg

And found out about the fresh DNA...:(

BathroomProjectday5FreshDNA.jpg.831cdc09d494ae633137c7982af228fe.jpg

Chisel got me twice, never felt either of them..I guess it is sharp enough..:JawDrop:

And...finally...soaked clear through (even with the fan set on HIGH!) kind of sore...:BangingHead:

BathroomProjectday52framesdone.jpg.62d5f6f53057aded9da0853c75d67fde.jpg

Both frames have now been dry fitted up..been measured for the raised Panels...10" x 10-1/2"....need to work on trimming and raising 2 panels...tomorrow..:GoodNight:

 

Stay tuned..:cowboy:

  • Popular Post
9 hours ago, steven newman said:

And found out about the fresh DNA

Is that "Stevenwax" type A, B, AB or O stain?;)

  • Author
  • Popular Post

A Pos.

 

Trimmed the 2 panels to size...second one was having "issues"...and decided to try and fly away....however...

BathroomProjectday5KICKBACK.jpg.1720c894e4248f62057523f0c170b94f.jpg

This was under my shirt, when it got stopped..Ouch..

 

None the less, both panels were trimmed to size, the "good face was given 4 bevels..

BathroomProjectday5raisedapanel.jpg.8d2be10ce545d390d5ce7b0ce6a6da6d.jpg

And a rebate was run on the inside...

BathroomProjectday5rebatetoofat.jpg.4f3c45bc7ab24ac6969c562f24c4ccf6.jpg

Will need that Sargent No. 79..as the rebates were to fat...dry fitted one panel...

BathroomProjectday5fullDryFit.jpg.eec879daef1b1cbe30adbf4a82870e96.jpg

Needs the burn marks sanded off..

 

two shop times..each about 1 hour long...

BathroomProjectday5busyafternoon.jpg.4b0a12b23ee969e6d3389ee57a40d691.jpg

Was a very busy day...

 

Stay tuned..:cowboy:

3 hours ago, steven newman said:

This was under my shirt, when it got stopped..Ouch

 

3 hours ago, steven newman said:

Needs the burn marks sanded off

Time for a new blade maybe? Glad you escaped serious injury.

  • Author
  • Popular Post

Burn marks...=...operator error.:BangingHead:..stopped in middle of the cut to change the grip...:ArguingSmileys:

 

Work holding set up..:TwoThumbsUp:

BathroomProjectday6workholdingsetup.jpg.9d6f77aa524bb2f649accf854e0aca6b.jpg

As all those Rebates are not deep enough....rather FAT ...so..:SaluteandRun:

BathroomProjectday6workingthatdirection.jpg.5dcd61b64f55103f3eb845b89222eecf.jpg

Yes...that plane will work just like that..depending on the grain directions

Test fit?  3 or 4 times, until..:ChinScratch:

BathroomProjectday6testforfit.jpg.dab7bc2970e2c9529df1f72245689bd3.jpg

Fits all the way into the groove...had all 4 rebates to do...and plenty of dry fits...until..:Cheer:

BathroomProjectday6insideface.jpg.7560f0a66bd7867a5b43dfc5ea83a05c.jpg

Glue & Clamps showed up...this is a view of the Inside of the Door...:TwoThumbsUp:

BathroomProjectday6outsideface.jpg.f15bd9dc00f773f35f0ab4b5016480f0.jpg

And..this is the outside of the door...due to the clamps, this is sitting on it's side...will "rotate" 90 degrees once the clamps come off...

Yard mowed, hedge trimmers run, Laundry Detail...and this...I think I be working way too hard...for a Friday..?:ChinScratch:

Stay tuned..:cowboy:

 

  • Author
  • Popular Post

Doors are out of the clamps.

.BathroomProjectDoorsreadytosand.jpg.ee1ca16020629fb5cf2909b383dcecd7.jpg

And awaiting filling and clean up..

tablesaw has just been run...

BathroomProjectneedthislater.jpg.e9724ae0da9bff641a0c3bd152705672.jpg

The 4 sides of the box have been ripped to width, and crosscut to length...

All depends on the Boss' Schedule for the rest of today...

Stay tuned..

  • Author
  • Popular Post

Needed 4 boards..:Tapping:

BathroomProjectSunday4sides.jpg.defcde9614ca769cfa37093f01ecab62.jpg

2 longs and 2 shorts...to build the cabinet's "Box"...long ones were from one board..but I needed a second board for the short ones..:SaluteandRun:

While the 2 long ones were close to the correct thickness..:TwoThumbsUp:

BathroomProjectSundayalmostthinenough.jpg.6e3f6d5fb5ad3876c3a9a137e57cffc5.jpg

The 2 shorties were not..:BangingHead:

BathroomProjectSundaytoothick.jpg.31e829fd315116043fc603ad55f1c323.jpg

Edges were in need of a good jointing, too..:ChinScratch:

We have ways..:ph34r:.Boards were clamped up and sat for a while...hoping to pull one curved board into flat...but, since I already had 1/4" extra to work with...:TwoThumbsUp:

BathroomProjectSundayBeforeAfter.jpg.f36fd0b18b73b740885a80ed99aa030d.jpg

A "Before & After"   :OldManSmiley:

Edges were also jointed..all of them..:ChinScratch:

BathroomProjectSundaySmallJointer.jpg.6a9bc5ce7343a573f269549ebddba84a.jpg

Notice the floor?  Yep, was that kind of a day...for about 1 hour...:KooKooClock:

Even the 2 long boards were worked on..:TwoThumbsUp:

BathroomProjectSundayalmostdone.jpg.40ebfc03d7ef43ee94eac7e6b1bcd992.jpg

Plane was made during WW2, BTW..a Stanley No. 6c...:SaluteandRun:

 

was able to get all 4 boards done, without too much of a mess..:rolleyes:

BathroomProjectSundaymakingshavings.jpg.1dcdf664c3e81b34e2d6aa303d463e43.jpg

Got a few toys out..:SaluteandRun:

BathroomProjectSundaylayouttools.jpg.991cd234cb129998d2b4f7cedc95cac1.jpg

And started a wee bit of layout work..:TwoThumbsUp:

BathroomProjectSundaylayouts.jpg.145b086a9711072ac1ae9c108210da3c.jpg

To be ready for the next time in the shop...:ChinScratch:

Stay tuned  :cowboy:

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.