May 26, 20251 yr Popular Post comment_356821 I have not posted recently but am happy to say that the master bath remodel is complete. This is one of the few home projects that I sat on the side-lines and watched the professionals. If you want to see the build pics, look here. Thanks for looking. Danl Report
May 29, 20251 yr Author Popular Post comment_356910 Thanks guys. Sitting on the side line had a few trials. The electrician routed the wiring to the switches through the medicine cabinet bay, attempted to not center the light above the vanity, did not position the two ceiling lights in the correct location, and did not route the wiring to the switches in the order my wife wanted them. The plumber located the toilet flange so that the tank hit hard against the wall, and the carpenter forgot to trim out the window, and laid a floor tile with a tile spacer underneath it. All of these issues were found by my wife and I. With some discussion and argument for the toilet and floor tile, with the project manager, they performed the rework to our satisfaction. Danl Report
May 29, 20251 yr comment_356929 You did a beautiful job on the cabinet, the highlight of the room. Report
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.