Skip to content
View in the app

A better way to browse. Learn more.

The Patriot Woodworker

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Supporting Our Service Members
We proudly stand with all United States service members in Operation Epic Fury and those deployed around the world. Your sacrifice, courage, and dedication are deeply respected and never forgotten.

Shop Expansion underway finally, Part 2

Featured Replies

After over a year of waiting the shop expansion is finally underway. About a month ago which was a year later, I got the footings dug so we could ready to pour them and the concrete slab all at the same time.

Starting footings.jpg

 

Footings dug.jpg

 

I had to move my electrical going to the shop before the footing and slab could be done so I got that done and a new box in the shop to give me more circuits and additional power.

Electricial in trench.jpg

 

So with the footings dug, I could finally get the concrete guy lined up and thankfully he was where he could get right on it and pour the footings and slab all in one pour.

Concrete Poured.jpg

 

After it started to setup, they got on it and put a smooth finish on the concrete so it will make a nice shop floor. Also installed the "j" bolts to anchor the walls to the concrete.

Concrete Finished.jpg

 

Today all the material got delivered so we can get started framing the walls. 

Shop Material.jpg

 

Of course the weather has gone super hot now. It is in the upper 90's with about 80% humidity so we have weather you can wear. I got out and worked for a while and got all the old vinyl siding off so I can start framing the walls.vinyl siding removed.jpg

 

On the end where the door is will be my office. In the middle will be a lumber or scrap wood storage area. It will have double doors to get into from the outside. On the left side will be the finishing room. About 12'x12'. It will have french doors coming in from the end and windows on this side so we get lots of natural light in the room. Once I am framed up and in the dry I will open access from the inside of the shop to the storage and finishing room. I'll update you further as I move along in the southern heat!

Laying out rooms.jpg

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.