Jump to content

Search the Community

Showing results for tags 'trucks'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • The Woodworking Discussion Forum
    • Introduce Yourself
    • General Woodworking
    • Wood Turners
    • Finishing
    • Wood Carving
    • Hand Tools
    • Scroll Sawing
    • CNC
    • Shopsmith
    • Show Us Your Woodworking Shops
    • Machinery, Tools, Research, Reviews and Safety
    • Plans and Software
    • The Veterans Corner and Causes Forum
  • The Old Machinery Discussion Forum
    • Old Woodworking Machinery
    • Old Metalworking Machinery
    • Old Machinery Operating and Restoration Tips
    • Old Machinery Badges and Decals
    • Old Machinery Swap and Sale, Classifieds
    • Old Machinery Hitching Post
    • Old Woodworking Machinery Archive
  • The Home Improvement Forum
    • Home Improvement
    • Patio and Outdoors
  • The Scrap Bin
    • Free for All
    • The Patriot's Pulse
    • Announcements
    • Bugs and Issues

Categories

  • Honoring the Fallen
  • Warrior's Christmas

Categories

  • The American Woods
    • The Softwoods (Conifers)
    • The Hardwoods (Broadleafs)

Categories

  • Book and Literature
  • CNC Files
    • CAD Files
    • CAM Files
    • CNC Reference and Tutorials
  • General Woodworking
    • Shop Charts
    • Shop Jigs
    • Shop Furniture
    • Arts and Crafts
    • Furnishings
    • Musical Instruments
    • Wooden Toys
    • Yard and Outdoors
  • Home Improvement
  • Old Machinery Manuals
  • Old Machinery Badge & Decal Images
    • Beaver Power Tools-Callander Foundry
    • Delta Specialty Co.
    • Delta Mfg. Co.
    • Delta Milwaukee
    • Delta Rockwell
    • Walker Turner
    • Sears Companion
    • Sears Craftsman
    • Sears Dunlap
  • Sketchup Sharing Center
    • Furnishings
    • Shop Jigs
    • Arts and Crafts
    • Sketchup Tutorials
  • Scroll Saw Patterns

Blogs

  • Building A Walnut Shotgun Case
  • Military Challenge Coin Display Build
  • SJUSD Veterans Recieve Plaques from Patriot Tigers
  • The Pastor’s Table or I Think My Sister Is Trying To Buy My Way Into Heaven
  • Small Patch Musings and Such
  • Photography
  • Steve Krumanaker
  • Christmas 2016
  • Cherry Entertainment Center
  • Another Church Table
  • Inside Out Turning
  • Segmented Turning
  • Canon Ball Bed
  • Situation Normal, All Fired Up
  • DUST COLLECTORS 101
  • Workbench PIP
  • Republishing the French Rolling Pin blog
  • Thickness Sander
  • Shopsmith lathe setup
  • Drying Turned Wood
  • New Projects, shop stuff, new tools,
  • Bill Kappel
  • Bowl Drying Adventures
  • Chess set

Product Groups

There are no results to display.

Categories

  • Members
  • Sponsors
  • Administrators
  • Forum Hosts

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Found 1 result

  1. steven newman

    The Foundation Saga, Day 3

    Finally able to get back to this little story. Ok, it is the morning after all the forms have set up and lined up. Everything is ready to pour. On some jobs, we had to set aside three plastic containers. These would get filled just like the forms will be. They would then be sent out for testing. Generator gassed up and running, cords ran. Empty 5 gal. buckets set out.....? While we'd wash off with the truck's hose, after the truck has left, we'd still need water to clean the small towels.. Truck is on the way! We need a Chuteman, a Vibrator man, and a mag trowel man. Would help to have someone guide the truck, too. Some of the drivers I have seen.....needed all the help they could get. We'd start at a corner, farthest away from where the truck would enter the site. Then we'd work towards the entry spot. When the chutes arelowered a bit, we'd have the driver run out a few shovel fulls and check IF it was wet enough to work with. Usually, we'd add more water....looking for a 6" Slump. Pour it thin, and watch it fill. Too stiff a pour is a lot of vibrating to get the mud to flow. Stiff mud also will "Hammer" the forms, leading to problems. Like BLOW-OUTS!. Usually, we'd luck out, and get the newer front chute trucks....trucks with chutes out the back are a bit hard to control. Front dumpers, the driver is in control of the chute, Chuteman merely directs where the chute needs to go next. Rear Dumpers.....Fun is not a word I like to use here. You NEED a driver who will LISTEN to the chute guy. have seen a few where the chute guy is left hanging from the chute over a trench. Do NOT get in a hurry with placing the mud, pour enough for one lift at a time. On the walls today, that would be a 2' high pour, all the way around, then start again and finish the second 2' pour. Too much too soon leaves voids, and can cause blow outs. Vibrator guy: Motorized snake he dips to the bottom of the forms, to drive out any air trapped in there. I say "DIPS' because you do not just slam it to the bottom and leave it there. You dip it down about 3 times, and then move on about 2-4', and dip again. While you can slam it to the bottom, you should pull it back up just a hair slower. Lots of times, the V man will walk along on top of the forms, keeping an eye on the chute. It stops, he stops. You do want things to get to where the chute will knock the poor guy off the forms. mag trowel guy: First lift, he follows along the rest of the crew. No need for the trowel just yet. Hs job is to watch the forms, and make sure all connectors stay that way.....usually has a framer hammer in hand. Ok, first lift is done, second truck NEEDS to be waiting over at the start point, ready to go. You grab the "sock" off the chute of the first truck, IF it is yours, and not the truck's. Find out IF the second driver has one. Check how wet his load is. And start along in the same direction as before. You want a hair of a delay between the two, to let the first load settle a bit, but, not too long. Too much time delay leads to cold joints. Now as you go along chute man loads enough into the forms to just cover the grade nails, as the V man will knock it down a bit. Trowel guy works the surface to bring up the cream. He also tries to bring the surface up to grade. Sometimes, we'd have someone with a shovel, walking along and adding a bit of mud to help reach grade. V Man still has to plunge all the way to the bottom, and pull the snake all the way back out. usually once every 2' will do the trick. have a place set up for the trucks to wash out at. Have a wheelbarrow there as well, never know IF you will need a shovelfull here or there.. Once the trucks are done, you set up the transit/builder's level at the batter boards. One one the transit one on the wall with a speed square and a hammer. Task is to align the wall as needed. Hammer it for turning the turnbuckles to adjust the wall. You work your way around the walls. Walls are now straight, and plumb. Trowel man is still working along the top of the wall. IF it is just grade nails, he will pull them out at this time. Champfer strips will come off when the forms are stripped. Sometimes, we would go back over the top of the wall, as some would want a slick finish. I had a steel trowel cut to just fit between the forms on an 8" thick wall. Buckets of water to wash the tools up with. However, do NOT wash the end of the vibrator by dunking it into the bucket, and turn the switch to "ON".......you and anyone else nearby will get a bath. Just spray it off with the last truck's hose. Wall is done. lay some plastic over the tops of the forms and tack it in place. more to keep any rain OUT. Reset the yellow tape around the site. put the tools away.....except IF there is to be anchor bolts or inserts floated in to the top of the wall, trowel man will install those. They have to be hooked onto the top rebar in the wall. Any that were already installed, needed to be shaken a bit, to get the air out from around them, and under the plywood template holding them there. Put the Generator away, roll up the cords. Tomorrow you can come back and strip forms all day long. Stay tuned for that. This was meant to stop when the wall was poured and stripped. Framers can take this job from when the concrete is ready for a load on them.....maybe a week, usually 2. This foundation with have a crawl space, so there are a few things left to do for that to happen..Stay tuned
×
×
  • Create New...