Search the Community
Showing results for tags 'nightstand'.
-
It has been a while since I last posted the progress on my Mission style nightstand. It was designed to allow the side subs, bottom shelf, drawer rail sub, and upper rail sub to be finished prior to assembly. Finish is (1) coat med brown trans tint dye stain, (1) coat seal coat, (1) coat GF gel stain, (1) coat seal coat, and/or (2/3) coats of SW Kem Aqua Plus clear dull rubbed (WB lacquer). The receipt is a Jeff Jewitt schedule which closely resembles the Stickley look. I’m now working on door panel mother-of-pearl inlay and dovetail drawer. . I have started on the bed. All (4) post/legs have been sized and the rails have been planed to rough dimn. I have a need to build a mockup for the leg to rail interfaces. The side rails will be attached using a double mortise , loose tenon, hidden bolt & nut assemble. I also plan to make my dovetails using the TS method. It may be a while before I post again. I have been volunteered to remodel my son’s home bathroom, starting Oct.1 More to follow. Thanks for looking. Danl
- 8 replies
-
- bedroom set
- nightstand
-
(and 2 more)
Tagged with:
-
From the album: Walnut Night Stand
Back view, showing the armrests, and the slats for the back. Back rung is a store-bought 7/8" dowel. Finish is two coats of Witch's Brew ( Pumpkin Pine?). The "bench" in the background is my Saw Bench, now over 2 years old.- 2 comments
-
- nightstand
- walnut
-
(and 2 more)
Tagged with:
-
I thought I would share a few progress pics. Just need to add glue and a few more hundred items to complete. Thanks for looking. Danl This is a sample for the final finish schedule. I will be using a modified Jeff Jewitt receipt. Stain with TransTint Medium Brown diluted at 1 oz dye to 1 qt. water Apply one coat Zinssar Bulls eye sanding sealer. Let dry and scuff sand with 320 grit Apply General Finishes Antique Walnut Gel Stain. Wipe clean and let dry overnight. Apply 2 or 3 coats Sherwin Williams Kem Aqua Clear (WB lacquer) Top of the night stand after it was drum sanded. Still in rough dimn. Just a few rails with single and double tenons. I have (52) mortises and tenons. Twelve are double tenons. Floor subassembly - dry fit Side subassembly Side subassembly looking inside/outside Door subassembly
-
