Jump to content

Recommended Posts

Posted

As most know we are building and I am getting a new shop. This is a metal building, not the kind with large I-beams. I will be adding stud walls inside only around the perimeter . I plan to put 1 x 3 around the building to attach stud wall and of coarse attach bottom plate to concrete. My question is should I attach wall to just one 1 x 3 or have a upper and lower 1 x 3?

  • Like 3
Posted

Hey Gerald, so the metal building had small vertical ibeams that support the metal walls, and you want to scab on the 1x3 so you can drywall the interior?

  • Like 2
Posted

I think I would use the 1x3’s at the top and mid way to the floor to provide more rigidity when adding wall coverings/internal storage 

Posted
39 minutes ago, John Morris said:

Hey Gerald, so the metal building had small vertical ibeams that support the metal walls, and you want to scab on the 1x3 so you can drywall the interior?

Yes . But it is not I beams, more like formed steel.

  • Like 1
Posted
3 hours ago, Gerald said:

Yes . But it is not I beams, more like formed steel.

I would definitely frame it out, bottom, top. What's going to be your spacing between the 1x3 studs (so to speak).

  • Like 2
Posted

Planning on 16 for studs

  • Like 2
Posted

Your installing your wall covering over the 1x3's right?

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...