Gerald Posted July 20 Report Posted July 20 As most know we are building and I am getting a new shop. This is a metal building, not the kind with large I-beams. I will be adding stud walls inside only around the perimeter . I plan to put 1 x 3 around the building to attach stud wall and of coarse attach bottom plate to concrete. My question is should I attach wall to just one 1 x 3 or have a upper and lower 1 x 3? Al B, lew and Fred W. Hargis Jr 3 Quote
John Morris Posted July 20 Report Posted July 20 Hey Gerald, so the metal building had small vertical ibeams that support the metal walls, and you want to scab on the 1x3 so you can drywall the interior? lew and Fred W. Hargis Jr 2 Quote
lew Posted July 20 Report Posted July 20 I think I would use the 1x3’s at the top and mid way to the floor to provide more rigidity when adding wall coverings/internal storage Fred W. Hargis Jr, Gerald, HARO50 and 1 other 3 1 Quote
Gerald Posted July 20 Author Report Posted July 20 39 minutes ago, John Morris said: Hey Gerald, so the metal building had small vertical ibeams that support the metal walls, and you want to scab on the 1x3 so you can drywall the interior? Yes . But it is not I beams, more like formed steel. Fred W. Hargis Jr 1 Quote
John Morris Posted July 20 Report Posted July 20 3 hours ago, Gerald said: Yes . But it is not I beams, more like formed steel. I would definitely frame it out, bottom, top. What's going to be your spacing between the 1x3 studs (so to speak). Fred W. Hargis Jr and lew 2 Quote
John Morris Posted July 20 Report Posted July 20 Your installing your wall covering over the 1x3's right? lew 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.