November 23, 20169 yr Popular Post Got the last circuit in the shop this afternoon. 20A circuit with 5 boxes of a switched and un-switched duplex outlet each. I can now walk into the shop and turn on 4 LED and 4 Fluorescent 48" fixtures with one switch and have an outlet for tools running down the middle of the shop. Finish area is not ready to go yet, and I do want to build an assembly table and table saw out-feed table, but I can now start taking orders, first two will be mudroom bench/coatrack for one daughter and dresser for a grand-daughter. My hands and shoulders are sore from working with all that 12/2 and 12/3 wire. Edited November 23, 20169 yr by kmealy
November 23, 20169 yr Author Might take a picture once I get all the electrical stuff picked up. Too pooped to do it all today.
November 24, 20169 yr Author 4 hours ago, Stick486 said: 'bout time... Building walls and doors, putting in circuits, moving, closing on the old house, working some, mowing 2 acres, installing shower doors and drapery rods, sanitizing and painting bee hives, doing a couple of projects for the woodworking club, a camping trip, and a couple of weeks out of town. I'm peddling as fast as I can.
November 24, 20169 yr 4 hours ago, kmealy said: Building walls and doors, putting in circuits, moving, closing on the old house, working some, mowing 2 acres, installing shower doors and drapery rods, sanitizing and painting bee hives, doing a couple of projects for the woodworking club, a camping trip, and a couple of weeks out of town. I'm peddling as fast as I can. you need a clone.. in fact, make that several...
November 24, 20169 yr No real need to rush, take your time and enjoy it. Congrats on the progress. Edited November 24, 20169 yr by Fred W. Hargis, Jr
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.