August 1, 201115 yr comment_42510 Good Morning Friends,When erecting a scaffold for work on the side of a structure. What is the most important factor to be used that will assure a safe walk way at all times? Report
August 1, 201115 yr comment_42516 Securing it to the side of the structure? John MorrisThe Patriot Woodworker Report
August 1, 201115 yr comment_42513 Scoffold must be level or pretty darn close. Scaffold starts from the base (floor/ground) up. Safe blocking at the base to bring it to level or adjust the wheel inserts to do the same. Report
August 1, 201115 yr comment_42512 Have them erected by some one who knows what they are doing. Report
August 2, 201115 yr Author comment_42511 Good Morning All,A big fat BINGO for all as one can not be too safe when working on a scaffold. We were working on a building on the State Fair ground in Columbus, Ohio and the scaffold was three bucks high and while moving it to another location it dropped into a depression in the floor of only 1 1/2" and the entire scaffold came crashing down. It was a good thing the no one was riding on top as it was being moved. Report
Archived
This topic is now archived and is closed to further replies.