Danl Posted June 21, 2023 Report Posted June 21, 2023 A few more progress pics of the Mission style bed build. Danl Qty (60) 7/8" x 7/8" spindles with 1/2" x 5/8" x 5/8" tenons, both ends. 1/8" x 1/8" chamfers routered on the bottoms of the legs. Headboard dry-fitted. The 1st time I tried the dry-fit it took 1 hr. This time it took 10 min. It should be adequate time with the Titebond hide glue. Headboard, footboard and side-rails dry fitted with the slip tenon also not glued yet. Epoxied the weld nut to the bottom of the slip tenon Glued the slip tenon into the mortise and drill hole for peg (belt and suspender approach). The peg will be hidden when the headboard and footboards are assembled. Used the cut-off to help make a gluing caul. I attached cork the side that touches the corbel. The corbel is splined to the leg. Getting ready to apply finish. I will be finishing most parts separately. The finish schedule is (1) coat dye, seal coat, (1) coat stain, seal coat, and then 2-3 coats of WB lacquer. Thanks for looking. Danl 4DThinker, Gerald, Fred W. Hargis Jr and 1 other 4 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.