Jump to content

Workbench completion


Gerald

1,440 views

I really thought I had finished this post and discovered today that was not the case . So here goes. Now the lumber was finally here and cutting parts to size and glue up for thicker parts begins.

1617372601_P3120829(Medium).JPG.0723476777cf53ab3498de843acf8d1b.JPGP3120831.JPG.fa3cd49435ddf08c136987a06f1cb5e3.JPG

 

 

 

 

 

 

 

 

 

 

 

These wider pieces were real fun doing the glue up on. Kinda like holding a snake who wants to run. The next photo is the legs. Note I used a waxed spacer to keep the slots open and spaced properly for end cross support.

 

428866078_P3120833(Medium).JPG.3af4f1ddba8a132b2678ede2f8c666d3.JPG1684071424_P3180842(Medium).JPG.578b1b7ee52fcb3294ed38b71345b364.JPG                                                               

Now the fun begins with the heavy lifting. Three pieces of MDF half sheets 24 X 72 glued up for the top. And then this is what the wide pieces look like after glue up is cured.

 

P3180843.JPG.edd97423c726538bb3e4cc9de53bc834.JPGP3180844.JPG.97a70b2d13fd4448dfebc617a3113a87.JPG                                                  

Time to edge band the top and a look at the legs with stretcher ready for assembly.

 

1947513634_P4050850(Medium).JPG.ec0fe29873f4ffd5071394832ff3780e.JPGP4050851.JPG.a7150081e4cf75b716307fd40f53edd0.JPG                                        

Top is now banded and work begins on adding the vices and some heavy trim to hold the vices.

 

P4050853.JPG.d8b7fc28b406a1ecf49de1e5d3eeb7db.JPG1029287856_P4260991(Medium).JPG.fa6f07f59d3fd17723255eadd8c20df3.JPG

                                

Now to assemble the legs and put the base together.

 

590175636_P4260992(Medium).JPG.f422a326ed632fdc7d25eb0edb06c9ef.JPG482876444_P5290993(Medium).JPG.941fb1f7d9b4e3cb88cd2831633aad0a.JPG                                        

This is a look at the bed bolts holding the base together. The top has a layer of 1/4 masonite to allow changing is damaged. This is secured with brass screws. This top is so heavy there are no fasteners holding it down . It is simply sitting on top of the frame.

1090723468_P5290994(Medium).JPG.d753c0a6e194c4e4fb6f425dd23cd5a6.JPGP6081038.JPG.72d94840da6218720d334253e090e60a.JPG                                              

The drawers units were built later with the top two drawers being added after the others were done. The dog holes were drilled using a block of scrape oak to hold the drill straight. Then they were countersunk to male insertion of dogs easier. This last pic is the back where you can see the addition of two drawers clearly. I did not take pictures of the mounting of the vices and building the front faces, a "fun" job. The drawers now have Kaizan foam lining . Planes drawer is the last photo.1858886218_Planedrawer.JPG.5fe4983bf867423bb3b921ef792d21eb.JPG

                                                                                                                                                                         

IMG_5079.JPG.ad278c021fa8cab612efac40cf9e8eba.JPGIMG_5085.JPG.e368db1c0f54163afe66d79ef764c7d0.JPG

Edited by Gerald

6 Comments


Recommended Comments

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Add a comment...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...